~ FLOOD PROTECTION SOLUTIONS ~
PROFESSIONAL FLOOD BARRIERS FOR AUSTRALIAN CONDITIONS
Coastal Equipment Specialises In High-Quality Flood Protection Systems Designed To Meet Australia's Unique Environmental Challenges.
Our Comprehensive Range Of Food Barrier Provides Reliable Protection For Residential, Commercial And Industrial Applications Across Diverse Australian Landscapes.
Inflatable Quick Dam Flood Barriers:
Water - Filled Rapid Response System
Our Inflatable Quick Dam barriers offer superior stability and flexibility for medium to long-term flood protection. These water-filled barriers can be rapidly deployed and provide excellent protection for riverside locations and building perimeters.
Key Specifications:
- Material: Heavy-Duty PVC-coated tarpaulin;
- Thickness Options: 0.9mm or 1.5mm;
- Standard Heights: 300mm, 600mm, 900mm, 1m, 1.2m, 1.5m;
- Standard Lengths: 5m, 10m;
- Colour: High-visibility orange (custom colours avail);
- Valve Sizes: 1", 2", 3" diameter options;
- Warranty: 12 months
Superior Performance Features:
Rapid Deployment System
- Faster Set up than traditional Flood Barriers;
- On-site assembly capability;
- Saves more property in less time
Exceptional Stability
- Maintains stability even when damming Water to full height;
- Flexible design works on lawns, concrete and asphalt
- No ground damage from installation
Modular Connectivity
- Patented linking system creates continuous dam walls;
- Extend to any require length;
- Flexible construction prevents leakage under barriers
Transport Efficiency
- Deflated transport for easy loading and handling;
- Reusable flood defence system;
- Use exactly where needed, when needed;
Applications:
Infrastructure Protection:
- Riverside flood defences;
- Essental road protection in flood zones;
- Railway line protection through levee enhancement;
- Transport link preservation;
Property Protection:
- Single building protection;
- Whole residential area defence;
- Industrial and commercial perimeter protection;
- Temporary cofferdam for water environment work;
Coastal Equipment Installation & Maintenance Guide
Inflatable Quick Dam Flood Barriers
Pre-Installation Requirements:
- Water source for filling (town water, bore or tank water);
- Garden hose or pump system;
- Basic tools such as a spanner for valve connections;
Installation Steps:
1. Positioning:
- Lay deflated barriers in desired location;
- Connect barriers end-to-end using the patented linking system;
- Ensure valves are accessible for filling;
2. Filling Process:
- Connect water source to barrier valve;
- Fill slowly to prevent over-pressurisation;
- Monitor barrier shape during filling - should maintain consistent profile;
- Fill to approximately 80% capacity to allow for water expansion;
3. Final Checks:
- Verify all connections are secure;
- Check for proper ground contact along entire length;
- Ensure barriers maintain structural integrity;
- Test stability by applying gentle pressure;
Filling Time Estimates:
- 5m barrier: 15-20 minutes with standard garden hose;
- 10m barrier: 30-40 minutes with standard garden hose;
- Times may vary based on water pressure;